Holy Childhood | Poettker Construction

Holy Childhood School Addition

 Location:  Mascoutah, IL      Owner: Holy Childhood School    |    Architect:  Niemeyer Design, LLC

Poettker was selected as the design/build contractor for a 5,840-SF addition and renovation to the Holy Childhood School in Mascoutah, Illinois.

The primary project goals were to provide a secured, accessible entrance, new principal and general office space, and to facilitate better security control of the overall school building. A new elevator addition was also constructed to give handicapped access to all three levels of the existing school building, and both floors of the cafeteria/gymnasium building. Lobby areas and restrooms were renovated for better accessibility.

The Poettker/Niemeyer Design Team worked closely with the school’s building committee to determine the best, quality construction solution for their budget. Major renovation and addition components were constructed throughout the summer to limit disturbances to school operations. A specific entrance was utilized to separate construction traffic from the students, faculty, and staff.

Key project components included:

  • New HVAC/HVAC renovation;
  • New roof/roof replacement;
  • New interior building/building alterations;
  • Life safety/fire protection

UNIQUE FEATURES

Secured, Accessible Entrance

Enhanced Security Control Throughout Building

Constructed Over Summer Months

The Poettker team did an amazing job during our recent second floor construction project. The second floor construction project was a unique challenge as the first floor renovation and the second floor construction needed to be completed in a short window so the first floor could be used for classes. Poettker’s team kept the project moving so it finished on time and under budget. We were so impressed with their work that our Board wanted Poettker to manage our upcoming renovation project which also brings certain timeline constraints. We’re excited to be working with the Poettker team again on this project.

– Greg Frerking, Superintendent
Freeburg CHSD #77

0
example
0
example
0
example

SIMILAR EXPERIENCE

Freeburg HS | Poettker ConstructionArcola Elementary | Poettker Construction